img

Results of the Evaluation of Expressions of Interest for the Control of the execution of the construction works of the runoff water collection basins and boreholes in the Northen, Upper West and Savannah in Ghana (Mission 1)

Date de publication :
Vendredi, 12 juin 2026

Ladies and Gentlemen,

In the context of the above-mentioned contract, we have the honour to inform you of the results of the evaluation of the expressions of interest. The list of candidates who obtained a minimum required score of 70 points for mission 1 is as follows: 

ID

Company name

Final Note

Rank

C04

GROUPEMENT CINTECH S.A -TPF

98,00

1st

C03

HOMELAND RESOURCES LTD

93,33

2nd

C07

GROUP INDUSTRIAL PROJECTS SERVICES (IPS)

85,67

3rd

CO2

GROUPEMENT SOCIÉTÉ D’ÉTUDES, RECHERCHES ET DE TECHNOLOGIES ADAPTÉES POUR LE SAHEL (SERTAS)-SOCIETE D'INGENERIE POUR LE DEVELOPPEMENT (SID)

85,00

4th

These candidates will be invited to continue the process. A template of the Request for Proposals will be sent to them in order to prepare the technical and financial proposal.

The selection method is "Quality and Cost Based Selection (QCS)" in accordance with BOAD's Guidelines for the Procurement of Consultancy Services Financed by a Loan or Cash Advance.

Please accept, Ladies and Gentlemen, the assurance of our distinguished greetings.